< back

>> EX UMBERTO I HOSPITAL

Client: ASUR MARCHE
Performance: Final and Detailed Design
Project duration: 1970 - In progress
Construction value: 8.241.163,25 Euro
STUDIO TI services: Building and Architectural

Renovation of “Ex Umberto I° 1-2 ward of Marche Regional Health Department.
The project developes through engineer design services for mechanical and electrical installations in order to obtain a normative adjustment.
The building is spread over n°2 building blocks, called “ward n°1” and “ward n°2”.
“Ward n°1, is spread over 5 above-ground floors, 500 sqm per floor, with the intended primary use for medical activities such as specialistic clinic;
“Ward n°2” is spread over 4 above-ground floors, 720 sqm
 per floor, with the intended primary use for elderly patient room with total of 70 beds.

search project

search by location:

search by type:

search by name:

search by year::
from to