< back

>> BUILDING SPORTS CENTRE 105 STADIUM

Client: MULAZZANI ITALINO S.p.a.
Performance: Preliminary Project, Definitive, Executive and Construction Supervision
Project duration: 1998 - 1970
Construction value: 9.456.325,00
STUDIO TI services: Building and Architectural works, Structural works, Mechanical and Electrical Systems


The building of the new Sports centre in  Rimini was the citizens reaction to an emergency risen in 1996 with the new regulations  of the Italian Basket Federation that stated that in case of failure to adhere to the new norms, the local team would have to fall back to a lower division.
Being a public work built and managed, by agreement, privately, the main objective of the project has been the identification of typological and technical solutions that guarantee a correct equilibrium between the  activity requirements, size of intervention and available resources for the  realization and management.

  • 5,500 seats and capacity of  up to a 7,000 people
  • general services (press rooms, interview rooms, VIP rooms, secretarial and editorial offices, meeting rooms, exhibiting rooms, refreshment areas, dining halls)
  • technical and storage services 
  • catering area

The levels of acoustic quality and comfort are high, with total darkening in the stalls, with a  rational use of the spaces and walk way routes also for operators responsible for setting up stands and stage sets.
Today the “105 STADIUM” is run by expert professionals specialized in the management of multifunctional areas and in the organization of events such as basketball matches, concerts and musicals.
palasport 105 stadium 

search project

search by location:

search by type:

search by name:

search by year::
from to